Record rotating linear gate success and bounded nonlinear follow-through

This commit is contained in:
2026-09-17 18:09:41 -04:00
parent 5298d88ed0
commit 83afd824ef
2 changed files with 63 additions and 4 deletions

View File

@@ -247,7 +247,46 @@ numbers alone do not make this an acceptable physical model. The independent
audit records these failures separately from successful linear solves and
artifact verification.
The hard rotating nonlinear case and the targeted rotating coupling
follow-up are still running or pending. Production defaults remain unchanged:
the stronger inverse is an optional typed policy, and the coarse candidate
remains an experiment.
## Rotating nonlinear follow-through
The n = 1, J = 0.1 positivity-curvature run accepts one full Newton step after
an initial positivity repair. Its first linear solve passes in thirteen
iterations with relative true defect 0.023583. The second reaches 200
iterations with defect 0.0315391 and fails the unchanged 0.03 gate, before a
second trial can be tested. There are no line-search rejections. This case
therefore retains a linear obstruction as well as an unconverged nonlinear
state.
The final nonlinear residual is 0.00896796 against a target of 8.58812e-10.
Summed Newton time is 139.198 s, including 113.338 s in outer linear solves
and 18.544 s in preparation; full diagnostic-run wall time is 201.245 s.
Enthalpy-pressure virials are approximately 0.0108 and fail the physical
milestone. Density-pressure virials are undefined, with sampled density
minimum -0.00692627 and 2015 negative samples at quadrature order 18. The
enthalpy positivity policy passes its checks, but does not establish density
admissibility.
The historical rotating run starts from matching physical diagnostics and
uses matching physics and linear controls, but permits eight Newton steps
instead of twelve. Its endpoint is not used for a controlled timing claim.
All 67 full-campaign provenance checks pass; physical and solver failures are
retained as experimental outcomes, not treated as successful convergence.
## Complementary rotating coupling
`rotation_coupling_v1`, built from `5298d88`, combines cached stellar LDU with
one consistent gravity Schur correction at relaxation 0.5. On the saved
rotating plateau state it passes the unchanged 0.03 gate in 142 iterations,
with relative true defect 0.0299068971 and complete verified cost 96.8236 s.
Its fresh independent control reproduces the original 200-iteration defect
0.0826534298794 and costs 85.8991 s. The earlier independent control still
failed at 600 iterations, so there is no measured finite baseline
time-to-convergence with which to form a speedup ratio.
This combination succeeds where either isolated change failed on this frozen
rotating problem. It does not establish nonlinear convergence. One bounded
eight-step positivity-curvature run is pending to check that distinction;
its budget matches the historical rotating run.
Production defaults remain unchanged: the stronger inverse is an optional
typed policy, and the coarse candidate remains an experiment.

View File

@@ -0,0 +1,20 @@
[
{
"id": "n1_J0p1_positivity_curvature_stellar_ldu_gravity_schur",
"arguments": [
"--index", "1",
"--angular-momentum", "0.1",
"--strategy", "positivity-curvature",
"--no-central",
"--max-newton", "8",
"--restart", "160",
"--max-linear", "200",
"--linear-tol", "0.03",
"--rtol", "1e-8",
"--atol", "0",
"--preconditioner-variant", "stellar-ldu-gravity-schur",
"--schur-sweeps", "1",
"--schur-relaxation", "0.5"
]
}
]