# Gravity work accounting on direction rejection The combined polynomial-enthalpy and reduced-gravity strategy checks descent twice: once when selecting the enthalpy repair, and again after lifting the repaired retained direction into gravity coordinates. A successful gravity relift performs real auxiliary work even when the second check rejects the direction before line search. Previously, the successful-relift diagnostics were copied only after the second check. Its early rejection could therefore leave solve counts, iteration counts, timings, and the last inner residual at their earlier linear-solve snapshot. The snapshot now occurs immediately after successful direction capture and before the final descent check. Linear-report coordinates retain their existing meaning; this changes no tolerance, direction, state, or acceptance decision. The immutable `b21fa40` rotating `positivity-reduced` artifact records 20 gravity solves and a positive final merit slope. Those counters can omit a successful last relift: they do not distinguish rejection during enthalpy repair from rejection after relifting. Its `direction_repairs` count also includes a chosen positive repair fraction whose candidate subsequently fails descent. Historical artifacts must retain these qualifications rather than being retroactively interpreted as complete work counters. The regression is a repeat of that bounded combined rotating case, checking unchanged accepted states and residual history while accounting for all successful relift work. No extra numerical fixture or solver change is needed.