Match frozen trial metric validation to production backtracking

This commit is contained in:
2026-09-18 10:49:44 -04:00
parent 422c46bcbf
commit 25816d4328
2 changed files with 17 additions and 4 deletions

View File

@@ -59,7 +59,9 @@ every candidate evaluation, fresh selected-state replay and unchanged accepted
buffers/normalization. Only the accepted trial is replayed for quadrature-14 and
quadrature-18 physical observations, outside the timed selection phase.
Operation timings exclude artifact output and physical replay; search wall time
Operation timings include raw preparation, gravity correction and the coupled transaction.
They exclude setup, ordinary initial/final metric calls, final restoration, accepted
commit refresh, artifact output and physical replay; search wall time
also includes artifact output. Callback vector copies remain in the measured
transaction. The no-correction control captures the same tangent for a comparable
screen, so capture cost is reported separately and is not ordinary Newton work